Construction begins with the running gear and fitting the lower and upper hull parts together. Following both the Dragon and Black Ops construction notes parts are omitted or replaced and other areas filled. Apart from the hull parts and the links on the idler stations nothing else is glued at the moment. The rear deck is made up of lots of separate parts so test fitting is needed for a good fit. The first of the resin replacement parts is used here as well.
No comments:
Post a Comment