Saturday, 30 March 2024

Kanonenjagdpanzer Building Begins

Well, so far so good with the start of the build concentrating on the lower hull and running gear. Wheels and sprockets are well detailed as is the suspension. The tracks are link and length with individual links used around the sprockets and front idlers. Two types are provided so check the instructions. The tracks do suffer from far too many attachment points on the sprue which means you lose most of the nice bolt detail once cleaned up.  

I will replace the missing bolts with some punched plastic discs later. I did find an extra link was needed for a nice fit. I've also made sure the tracks can be painted separately as well. 




 

No comments:

Post a Comment