Thursday 14 February 2019

More D.I.Y

In between prepping the ceiling for painting I've also blocked up the old door to the man cave. Now the cave actually feels part of the house and more importantly it's more secure and warmer. I always used to get a vicious draft coming through in the winter which always made it bloody cold in the evenings. 

Eventually the block work will get plastered, probably when I empty the cave and rip up the carpet. I will be moving the light switch soon though which is a simple job. 




I have been modelling but only doing a small bit of work on the Churchill. I'm hoping to have it done before next weekend, which by the way is the on track show in Folkestone. 

1 comment: