Kit Reviews

Wednesday, 3 April 2019

Man Cave Tear Down

Today I've started stripping out the cave in preparation for the refurbishment. I've decided to start now due to the amount of stuff I have to shift and because I don't want this to drag on too long. I'm planning on a month maximum to get the room decorated, new floor down and at least a bench or two so I can continue to model. 

I'm not too bothered about getting new furniture before I get building again although I do plan on a mega shop at Ikea for this purpose. Already I've filled four big boxes with books and started a pile for the charity shop. With a bit of luck the cave will be clear by Friday!




No comments:

Post a Comment